Hi,
I have a couple of doubts about this topic;
1-I read that implementation of Safe system of work is more difficult than Safe working method. Why? What is the difference?
2-Hot work permit precautions; wooden floor damped. How would this be exactly done?
Can somebody help me to clarify? Thanks in advance for the support.
SSOW - PTW doubts
Moderator: Moderators
- Waterbaby
- HSfB Moderator
- Posts: 4714
- Joined: Sat Jul 23, 2011 10:53 am
- 12
- Industry Sector: Medical
- Location: Ireland
- Has thanked: 216 times
- Been thanked: 472 times
Re: SSOW - PTW doubts
WBEstherFT wrote: ↑Mon Mar 01, 2021 7:21 pm Hi,
I have a couple of doubts about this topic;
1-I read that implementation of Safe system of work is more difficult than Safe working method. Why? What is the difference?
https://www.hsa.ie/Search.aspx?cx=00082 ... ms+of+work
https://www.hse.gov.uk/humanfactors/topics/ptw.htm
https://www.hse.gov.uk/comah/sragtech/t ... permit.htm ( see bottom of webpage : Case studies illustrating the importance of permit to Work Systems)
2-Hot work permit precautions; wooden floor damped. How would this be exactly done?
https://www.healthandsafetytips.co.uk/f ... rk+permits
https://www.highspeedtraining.co.uk/hub ... -hot-work/
Can somebody help me to clarify? Thanks in advance for the support.