Risk Assessments within the Telecomms industry

Discuss all things health and safety.

Moderator: Moderators

Post Reply
TripHazard
Newbie
Newbie
Posts: 5
Joined: Fri Sep 03, 2021 12:42 pm
Has thanked: 1 time

Risk Assessments within the Telecomms industry

Post by TripHazard »

Hi,

I wanted to ask peoples opinions on risk assessments within the telecomms industry, directed towards working on 'telegraph poles'. I have been in the telecomms industry for a short time and wanted to hear if anyone else has the same issues.

Do you have to carry out a risk assessment per pole or as a job (As per site plan/Construction phase plan). My interpretation of the regs is each pole would have its own risks, so in my opinion it would have to have its own RA.

Currently I have a site specific risk assessment for a project which has been carried out by myself and an operative (Me being the professional H&S advisor and the operative being the competent person carrying out the work). The RAMS cover the work being carried out, as well as the safe procedures/Checks, safe systems of work etc associated with this type of work.

I then get the operative to carry out a daily/dynamic risk assessment prior to the work commencing/any changes to site in the form of a tick assessment (Similar to an app but paper form), for each pole. Is this too much?

This means the operatives might have to fill out 30 risk assessments a day, or depending how many poles he has to work on. The Mgt regs state 'Suitable and Sufficient', but am I over killing this?

Any opinions or guidance would be greatly received, because i'm all for making sure everyone is safe and we stick to legalities, but I also don't want to bog the worker down with millions of paperwork, as i want them to carry out the risk assessing to the site, get the job done safely but avoid them being in a place for to long due to working near busy roads.
User avatar
Juan Carlos
Anorak Extraordinaire
Anorak Extraordinaire
Posts: 644
Joined: Thu Sep 03, 2009 9:30 pm
12
Location: London
Been thanked: 21 times

Re: Risk Assessments within the Telecomms industry

Post by Juan Carlos »

Hi, not in the same industry as you, but my opinion is that you should try and minimise the paperwork on this. I would have a good generic risk assessment, a well documented SSofW (to which operators are trained against) and only request that an additional dynamic RA is completed is the activity / environmental conditions fall away from the things that are already covered in the RAMS.
TripHazard
Newbie
Newbie
Posts: 5
Joined: Fri Sep 03, 2021 12:42 pm
Has thanked: 1 time

Re: Risk Assessments within the Telecomms industry

Post by TripHazard »

Thank you for the reply. We have a safe system of work and good solid RA. So will look into it. Many thanks :D